  • 100927 Minera Escondida BHP

    Crusher Minera Escondida Site Visit, 27 September 2010 Slide 16 Port of Antofagasta. Operations production history Grade (%) Escondida copper production ((, )kt, 100% basis) Sulph Leach Phase 3.5 25 ktpd 5 Primary crushers

  • BHP Billiton,Minera Escondida, Chile CJC

    BHP Billiton, Minera Escondida, Chile "Increased productivity by using CJC ® Fine Filter" 87% less downtime and annual savings of up to 445,200 USD. Customer BHP Billiton, Minera Escondida, Chile System Primary crusher, Fuller Traylor gyratory crusher (FLSmidth) Oil type: ISO VG 320 Oil volume: 4,000 L Crushing capacity: 6.000 ton/h Problem

  • How our people are creatively making our workplaces safer

    The four primary crushers at Escondida require 4,400 litres of lubricant each, and, prior to the process change, it took 54 hours to complete the lubricant change for each crusher, during which the crusher was inoperable for 27 hours. The job required 22 empty barrels (208 litres each) to drain the existing lubricant and 22 barrels of fresh

  • Escondida site tour bhp

    Escondida: mine operations overview Mine mobile equipment • 18 shovels Total material moved per day 18 shovels (mtpd) • 171 trucks • 5 front end loaders • 20 drills 1.6 20 drills • 22 bulldozers • 19 wheel tyre dozer • 14 graders 1.2 14 graders • 13 water trucks Mine fixed equipment • 5 primary crushers 0.8 5 primary crushers

  • Primary Crushing Mineral Processing & Metallurgy

    Mar 17, 2017· Primary Crushing. The term “primary crusher,” by definition, might embrace any type and size of crushing machine. The term implies that at least two stages of crushing are involved, but in many cases the machine which performs the function of initial crusher is the only crusher in the plant. The factors influencing the selection of a

  • Primary Crusher an overview ScienceDirect Topics

    The primary crusher is located in the quarry and consists of a McLanahan 48″x72′ Shale King Crusher rated at 1,000 TPH (Tons Per Hour). The driving flywheel has a diameter of 2.5 meters and is motor driven through six v-belts. The capacity of the primary crusher had to be increased to 1,250 TPH to produce enough material to serve the wet

  • Primary Crusher Selection & Design

    May 05, 2018· How you select your primary crusher will be based on factors like moisture content, maximum rock lump size, material density SG, abrasion index, degradability and it being prone to dusting or not. The crusher capacities given by manufacturers are typically in tons of 2,000 lbs. and are based on crushing limestone weighing loose about 2,700 lbs. per yard3 and having a specific gravity of 2.6.

  • PIMASA

    Minera Escondida Ltda. Dust suppression systems were implemented in various areas of the project: Primary crusher, Oxides and Belts and Crushing. Primary crusher and in the unloading of the collectors of the areas 2300, 2400, 2500 y 2600. Minera Antucoya Primary crusher, belt transfers, Secondary crusher and Tertiary crusher.

  • BHP Billiton,Minera Escondida, Chile

    BHP Billiton, Minera Escondida, Chile "Increased productivity by using CJC ® Fine Filter" 87% less downtime and annual savings of up to 445,200 USD. Customer BHP Billiton, Minera Escondida, Chile System Primary crusher, Fuller Traylor gyratory crusher (FLSmidth) Oil type: ISO VG 320 Oil volume: 4,000 L Crushing capacity: 6.000 ton/h Problem

  • Expansion in South America: Progress and Sustainable

    Primary Crusher location heap system • Extension to Lomas Bayas mine life through development of Fortuna del Cobre orebody, 3km from the original pit • Production: 75ktppgga Cu using existing SX-EW plant • Approved capital cost: $293M • LOM: extended by 16 years to 2028 Project Status (as of Sept 2012) • Commissioned ROM system

  • BHP Billiton Approves Escondida Norte Copper Project BHP

    These costs include installation of a primary crusher, construction of an overland conveyor, maintenance and operating support facilities, some new mining equipment, the transition of a portion of the current Escondida mobile equipment fleet to the Norte open pit and waste pre-stripping of

  • Blockade lifted at BHP's Escondida mine MINING.COM

    May 04, 2012· The development plan will relocate the primary crusher and conveying system to access higher-grade ore and increase output from 2013. Aerial image of the Escondida mine by Wikipedia. 0 .

  • Chilean mining costs highest in the world, despite saving

    Nov 14, 2016· It would take a hell of a lot of sunlight and dozens of acres of solar panels to power a primary crusher. Escondida alone has 5. rodcha November 24, 2016 at 6:12 pm .

  • Bhp Billiton Crushers

    BHP Billiton, Minera Escondida, Chile Increased productivity by using CJC Fine Filter 87% less downtime and annual savings of up to 445,200 USD. Customer BHP Billiton, Minera Escondida, Chile System Primary crusher, Fuller Traylor gyratory crusher (FLSmidth) Oil type: ISO VG 320 Oil volume: 4,000 L Crushing capacity: 6.000 ton/h Problem

  • Raul Tejeda Bertens Design Area Manager Black & Veatch

    A 108,000 jobhours Primary Crusher Facility at the Escondida Site with a total investment of US$250M. • Directs and coordinates engineering activities for the ENFM project • Establishes the detailed project's engineering portion of the Project Execution Plan and the development of the overall project engineering hour budget and schedule

  • Thyssen Krupp to Built a New Crushing and Conveying System

    Thyssen Krupp Industrial Solutions, the plant engineering and construction specialist of the Thyssen Krupp Group, has won a contract from the Southern Peru Copper Corporation to supply a primary crushing and overland conveying system for the Cuajone

  • Martín Rodríguez Gleixner Director de Proyectos de

    2007/01 2007/08 Escondida Mine, Chile. Field Engineer Construction Manager Project in Escondida Mine. Civil works, Electrical and Mechanical erection works, Piping and Instrumentation of W9 Project (Primary Crusher Location´s change).

  • Mulatos Gold Mine Mexico Largest Gold Mines In The World

    Nov 29, 2015· The Mulatos mine is an open pit gold mine located in the state of Sonora, Mexico, approximately 140 miles east of Hermosillo city. Owned and operated by Alamos Gold, The Mulatos Mine is located within the Salamandra Concessions in the Sierra Madre Occidental mountain range in the east-central portion of the State of Sonora, Mexico.

  • Jaw crusher, Jaw crushing plant All industrial

    jaw crushing plant Escondida. stationary. Contact. jaw crushing plant. Escondida. General Machinery Jaw Crusher can be used material as the primary crusher, used as a secondary crusher to refine the material too. Compare this product Remove from comparison tool. See the other products

  • Major Mines & Projects Mulatos Mine

    The ore is delivered to the cone crusher, operating in open-circuit. The ore is discharged onto another belt conveyor where it is carried to the double-deck wet primary screen. The wet primary screen oversize ore is transported via a conveyor to feed the vertical shaft impactor (VSI). The screen undersize reports to the rougher IPJ feed pump box.

  • CJC Crusher Maintenance brochure, Mining Segment

    BHP Billiton, Minera Escondida, Primary Crusher CJC™ Fine Filter HDU 427/108 installed Dirty and saturated CJC™ Filter Insert A used inline filter. 8 Contamination of the Oil Cavitation & Pitting Occurs in areas where water is present and oil is compressed; the water implodes, causing the metal

Quick response, N-CAI Heavy Industry welcomes all sectors of society to contact us, we are waiting for your inquiry within 365x24 hours!